More Views from Building 1

Stairs are going into Building 1 (units F1-F6).  So, we went up to the rooftop deck to check out the amazing city AND mountain views.  Take a look!

Click on the link below:

nov-16-2016-medium

November 17th, 2016|Uncategorized|

Construction Update 10.6.16

Things are moving along at Art District Rowhomes.

Building 1- Framed

Building 2- Roof top decks being installed

Building 3 – 1st floor, start of framing

Building 4 – Foundation

 

October 13th, 2016|Uncategorized|

Views, views, views! Photos from 9.23.2016

Check out these awesome views taken on 9.23.16 from the deck of Building 1.

September 23rd, 2016|Uncategorized|

Installation of the I-Beam

The I-Beam was just installed in Building 1.

Check out this video to watch the proces:

setting-i-beam-bldg-2-medium

September 19th, 2016|Uncategorized|

Construction Update 9.14.16

Things are moving along as building one is in final stages of framing and building two is well on their way.

 

sept-14-2016-medium

September 15th, 2016|Uncategorized|

Views from 9th Avenue Units!

Check out these amazing views from the deck from the 9th Avenue buildings- incredible!!

Southwest Views

West Views

September 9th, 2016|Uncategorized|

Construction photos 9.1.2016

Please click on link “construction photos 9.1.2016”.

Building 1 is cruising along with framing.

Building 2 was prepping for framing on 9.1.2016 and as of the week of 9.5.2016, framing has begun!~

 

    

September 7th, 2016|Uncategorized|

Construction Update- Video from 8.19.16

Please click on “Construction Update- Video from 8.19.16”
Framing continues on Building 1 and unit F1 is already to the 2nd floor.
Click on the link to check it out:

8.19.16- framing building 1- F1 second floor

August 22nd, 2016|Uncategorized|

Construction Update 8.16.16

Please click on the link above “Construction Update 8.16.16”.

Framing has started on Building 1 (9th Avenue).  Framing for Building 2 is scheduled to begin around August 29th.  Take a look at this short video to see the progress!

8-16-16 – Medium

August 17th, 2016|Uncategorized|

Construction Update- 8.3.16

Please click on the link above “Construction Update- 8.3.16”

On the site: setting up for concrete pour of foundations and footings- quite the operation!

Check out the video here:

TEST – Medium

 

Other photos:

       

August 11th, 2016|Uncategorized|